Project Description
Stillwater Crossing
Project Details:
Location: Stillwater, MN
Scope: FRP Drainage System
for Bridges
Project Owner: MnDOT
Value: $500,000.00
Date: 2016 – 2017
We were approached by Aptus Group USA, LLC. to furnish just the labor to install the drainage pipe on the Stillwater Crossing project. We have have a crew there installing the pipe since last summer. When the weather conditions deteriorated over the winter, we had the crew in our shop assembling the brackets. This has been a great opportunity for us.